9 |
RAWG |
TE/MSC to check whether previously identified weaknesses (e.g. choice of insulation technology) can be integrated in checklist & to check together with RAWG if Weibull distribution could be used |
RAWG, TE/MSC |
31.12.2025 |
8 |
RAWG |
Enquire about feasibility of central repository of component aging test reports and models |
RAWG |
31.12.2025 |
7 |
RAWG |
Support collection of vibration profiles from existing equipment for reference of mechanical stress tests |
RAWG |
31.12.2025 |
6 |
RAWG |
Make time lost to VIP visits explicit, by adding adequate LHC sub-category LHC |
A. Asko, L. Felsberger, M. Hostettler |
31.12.2025 |
5 |
RAWG |
To link automatic fault recording between the SPS and the injectors, E. Veyrunes should set up a discussion between the AFT specialists |
E. Veyrunes |
31.12.2025 |
4 |
RAWG |
S. Ramberger will forward the request to his SPS RF colleagues to study a potential implementation of auto-restart and/or reset, to be discussed with SPS-OP SPS - 2025-02-04 - discussed between RF-SPS and OP-SPS, not necessary in the short term. automated fault resetting (per fault type) will be investigated so to be able to have solutions in place quickly if need be in the future
|
G. Papotti, K. Li |
31.12.2025 |
3 |
RAWG |
Discuss potential collaboration with NASA Ames on applying PLCverif to critical PLCs - 2025-02-14 - Project on hold indefinitely due to NASA collaboriation policy changes with new administration.
|
X. Fink |
31.12.2024 |
2 |
RAWG |
End of year availability review: Correct overall availability figures for changes in the LHC schedule |
L. Felsberger |
31.12.2024 |
1 |
RAWG |
Fix links from AFT to old logbooks |
B. Mikulec |
31.12.2024 |